Hello,
I have been assigned to configure Load generator for the load test. Previous project where i worked before, we use to have tools team and they were responsbile for all tools installation and validation.
Some of the things (As stated in step1)i am currently following to configure the load generator and need help/advise from expert to suggest if i am missing any steps.
1)Since there is no load generator machines, i have requested our management team to provide 5 to 6 Laptops/Desktop with good configurations , so that we can install Load generator agents on the machine and use it as LG during our test. Is this correct way to do?
So my question is,
Just by installing the Load genertor agent on those machines would be enough or should we do anyother configurations further?
Do we have do any configurations to connect Conrtoller and LG?
Please advise and advice on detail steps on how to configure load genertor and Controller.
Thanks in Advance.