Hi ,
we need to test push Xmls with large volume i.e. more than 1 Lac line of code, and push that to MQ, is it possible that through load runner?
As of now we are doing MQ testing with Java protocol by pushing the xmls to Queue, but what is the maimum lengh of xml we can test in Load runner?
Thanks
Anil