When a load test is configured on percentage mode to use multiple Load Generators the assignment does not take correctly the configured Load Generators during test execution in LoadRunner 12.
More details about this issue and a fix are available in the following knowledge document:
http://support.openview.hp.com/selfsolve/document/KM01016608